Recommended Services
Supported Scripts
Dedicated Servers · Thessaloniki
Dedicated servers for data storage.
Confirm the hardware.
Capacity alone does not describe a storage requirement. Consider access patterns, growth and recovery alongside the published disk configuration. The initial dedicated-server scope must identify the hardware model and intended stack.
- High performance
- 24×7 support
- 1 Gbit port speed
The specifications
behind the choice.
Compare the key specifications in the server rows, then review the complete details for the selected configuration.
SSD Dedicated Servers

Jupiter SSD
Intel® Core™ i7-6700 Quad-Core
RAM
64 GB DDR4
Storage
2 x 250 GB SSD
Data transfer
30 TB
Connection
1 Gbit/s
CPU: Intel® Core™ i7-6700 Quad-Core
RAM: 64 GB DDR4
Drives: 2 x 250 GB SSD
Drive configuration: Software RAID 1 SATA @ 6Gb/s
Data transfer: 30 TB
Bandwidth: 1 Gbit/s
Connection: 1 Gbit/s/port
Backup storage: 100 GB
Full root access
1 dedicated IPv4 address
IPv6 /64 subnet
VNC installation
Reverse DNS management
Redundant Network · Juniper Routing Technology
Minimum network availability: 99%

Neptune SSD
Intel® Xeon® E3-1275 v5 Quad-Core
RAM
64 GB DDR4
Storage
2 x 480 GB SSD
Data transfer
30 TB
Connection
1 Gbit/s
CPU: Intel® Xeon® E3-1275 v5 Quad-Core
RAM: 64 GB DDR4
Drives: 2 x 480 GB SSD
Drive configuration: Software RAID 1 SATA @ 6Gb/s
Data transfer: 30 TB
Bandwidth: 1 Gbit/s
Connection: 1 Gbit/s/port
Backup storage: 100 GB
Full root access
1 dedicated IPv4 address
IPv6 /64 subnet
VNC installation
Reverse DNS management
Redundant Network · Juniper Routing Technology
Minimum network availability: 99%

Mercury SSD
Intel® Xeon® E5-1650 v3 Hexa-Core
RAM
256 GB DDR4
Storage
2 x 480 GB SSD
Data transfer
50 TB
Connection
1 Gbit/s
CPU: Intel® Xeon® E5-1650 v3 Hexa-Core
RAM: 256 GB DDR4
Drives: 2 x 480 GB SSD
Drive configuration: SATA @ 6Gb/s
Data transfer: 50 TB
Bandwidth: 1 Gbit/s
Connection: 1 Gbit/s/port
Backup storage: 100 GB
Full root access
1 dedicated IPv4 address
IPv6 /64 subnet
VNC installation
Reverse DNS management
Redundant Network · Juniper Routing Technology
Minimum network availability: 99%
SATA Dedicated Servers

Jupiter SATA
Intel® Core™ i7-6700 Quad-Core
RAM
64 GB DDR4
Storage
2 x 2 TB HDD (Software-RAID 1)
Data transfer
30 TB
Connection
1 Gbit/s
CPU: Intel® Core™ i7-6700 Quad-Core
RAM: 64 GB DDR4
Drives: 2 x 2 TB HDD (Software-RAID 1)
Drive configuration: SATA @ 6Gb/s @ 7200 rpm
Data transfer: 30 TB
Bandwidth: 1 Gbit/s
Connection: 1 Gbit/s/port
Backup storage: 100 GB
Full root access
1 dedicated IPv4 address
IPv6 /64 subnet
VNC installation
Reverse DNS management
Redundant Network · Juniper Routing Technology
Minimum network availability: 99%

Mercury SATA
Intel® Xeon® E5-1650 v3 Hexa-Core
RAM
128 GB DDR4
Storage
2 x 2 TB HDD (Software-RAID 1)
Data transfer
50 TB
Connection
1 Gbit/s
CPU: Intel® Xeon® E5-1650 v3 Hexa-Core
RAM: 128 GB DDR4
Drives: 2 x 2 TB HDD (Software-RAID 1)
Drive configuration: SATA @ 6Gb/s @ 7200 rpm
Data transfer: 50 TB
Bandwidth: 1 Gbit/s
Connection: 1 Gbit/s/port
Backup storage: 100 GB
Full root access
1 dedicated IPv4 address
IPv6 /64 subnet
VNC installation
Reverse DNS management
Redundant Network · Juniper Routing Technology
Minimum network availability: 99%
Dedicated server management from €50.00/month
If your team needs help operating the server, discuss the responsibilities before ordering.
Custom Servers
Need a different configuration? Contact us for a server tailored to your project. Operating system and control panel options are available, along with additional IP addresses and backup services at an extra cost. Availability, compatibility and the total cost are confirmed before you order.
Hardware reserved
for your workload.
A dedicated environment combines hardware and network terms. Review the offered connection and traffic alongside the application’s data movement and operating requirements.
Root/Admin access
Keep staging credentials and service configuration independent of production. Administrative access lets you define the environment used for testing.
Operating system options
Confirm the required runtime against the available operating systems. Check supported versions and any licence costs before installation.
Dedicated CPU & RAM
Working memory and query behaviour can matter more than a headline core count. Use representative database activity to assess the available resources.
HDD, SSD or NVMe storage
A test environment may hold copied databases, builds and temporary files. Set a cleanup routine instead of letting unused releases consume the allocated storage.
Network-level DDoS protection
Availability also depends on application behaviour, maintenance and recovery. Treat network DDoS protection as part of that wider operating plan.
Dedicated IPv4
Each plan includes one IPv4 address. Additional addresses depend on availability, eligibility and cost.
Optional server management
Clarify who maintains the test stack and who can approve environment changes. Additional administration is agreed rather than assumed.
99% network availability
Minimum network availability of 99%, as listed for these server models.

Choose the operating environment.
For a database-heavy installation, compare data growth, working memory and software compatibility together. A larger disk does not resolve every query or memory constraint.










Deployment details matter.
Server location and service coverage are different. We confirm the available deployment region for the chosen hardware.

- United States
- Canada
- Asia
- Europe
- Australia
Plan the software
alongside the hardware.

HTML5

CSS3

JavaScript

Angular

ReactJS

Node.js

CloudLinux
A PRACTICAL STARTING POINT
Make the transfer a controlled change of environment.
Moving to dedicated hardware can also change operating system, storage layout and networking. Account for those differences before scheduling the cutover.
01 · Prepare
Inventory applications, data and configuration. Define the migration window, final synchronisation and return path.
02 · Verify
Test the destination using the agreed application journeys and compare the final data before switching traffic.
03 · Keep ownership clear
Retain the previous environment for the agreed interval and record who monitors the new server.
Illustrative sequence. The actual configuration and responsibilities follow the agreed requirements.
Port speed and traffic allowance answer different questions. One describes a connection rate and the other describes a volume or usage condition over time. Compare the published terms with regular downloads, replication, backups and any busy periods. Confirm the selected model’s actual offer before ordering; do not infer another server’s allowance from a shared product family. Keep a way to review usage as the workload changes.
DELIVERY & OWNERSHIP
Confirm the dependency before building around it.
Identify the provider, available access and the functions the external service actually supports. Include licence or usage restrictions that could affect the proposed work.
01 · Prepare
Check installation options, licences and compatibility with the specific server model.
02 · Verify
Check the intended operating system, hypervisor or control panel against the model and applicable licence requirements.
03 · Keep ownership clear
Identify the owner of software renewals and the route for resolving compatibility or provider installation questions.
HOSTING & TECHNICAL SUPPORT — CLIENT FEEDBACK
“His pricing is excellent, and his hosting options are more than fair. Communication was outstanding every time I contacted him, he responded promptly. When I had an issue with my email ,which was something I did to mess it up , he jumped straight on it and had everything sorted quickly.”
Benjamin S.
SERVICE AREA
For your audience in Thessaloniki.
Virtualisation.
Serving Thessaloniki can involve customers with different usage patterns. Describe when and how the audience uses the service rather than assuming the city name predicts demand.
Compare workload growth with the published CPU, disk and network specifications.
The map shows the area served, not a datacenter or a local office. The physical hosting location and availability are checked separately.
- Active data versus archived data
- Read and write patterns
- Recovery procedure and responsibilities
Thessaloniki
PRACTICAL QUESTIONS
Before we agree the next step.
Questions about the work, the checks and the handover.
It removes the need to share that physical server with other customers, but performance still depends on the hardware, storage, software and workload. Confirm the configuration against a real requirement.
Compatibility, access, available images and licensing must be confirmed for the specific model. Describe the intended platform before ordering so those requirements can be checked.
Permissions, runtime versions, services, database configuration, certificates and network rules can all affect the result. Verify the application on the destination before treating a successful copy as a completed migration.
YOUR NEXT STEP
Give a critical application an explicit operating plan.
Explain who will use and maintain the result. We can make the responsibilities part of the scope from the beginning.
Record who holds remote administration and application-maintenance access.
